|
CEFICARG in LAFARGE Cementos. Year 2007 |
CEFISA has with
notable success put into service the “Sistema de Gestión de Cargas”
(Loading Management System) in the three Spanish Lafarge Cementos
production plants in: Villaluenga de la Sagra, Montcada y
Reixac and Sagunto. The system is based on the CEFIcarg product.
The success of the project has led to the Award 2007 for the best project
carried out in Europe that year.
The CEFIcarg system
has been adapted to suit
the requirements and particular commercial procedures of the Lafarge
Cement Group. The system manages and controls despatch and
transportation of both bulk and bagged cement shipments, as well as
reception and storage of raw materials. The project
encompasses integration
of the Loading Management System with ERP and JDEwars systems,
thus permitting all administrative and accounting procedures to be
carried out automatically.
The benefits that this new system provides to the client include:
- Complete
real-time integration between sales data and the ERP system
for accounting, administration and commercial purposes.
- The
elimination of queues of lorries at entrances of the
plants.
- A drastic
reduction in the time needed by transport operators for
the loading cycle.
- Possibility to carry out loading 24 hours per day, 365 days per
year.
- Reduction of
personnel needed to operate entry and exit weighbridges,
as well as in the commercial office of the plant both on night and day
shifts.
- Control of
compliance with all standards and legislation both in quality control
(traceability of the product, checking of empty tankers, etc...) and transport (maximum
loads, tickets containing all data required by road traffic standards,
etc...
- The system
permits shipping to continue uninterrupted in the event of failure of
the ERP system, without affecting the client’s service and
provides automatic reconnection with the control system.
- Automatic
integration between Lafarge Cement and Transport companies.
|